API standard 650 tanks CSA specifications plates

BBN can provide design, manufacture and installation of API 650 large oil and crude oil storage tanks. We can build a API standard 650 tanks 7,000,000 gallon API 650 petroleum storage tank. In addition, BBN has the means to construct multiple storage tanks at the same time. We are very experienced in providing API 650 petroleum storage tanks.

The longer the service life of the API standard 650 tanks, the lower the reliability and the prone to failure. Doing a good job in the maintenance of the metal oil tank can ensure the normal use of the oil tank, reduce the wear of the API standard 650 tanks body and accessories, and extend the service life of the oil tank. The maintenance of metal oil tanks is mainly to do a good job in the anti-corrosion of the oil tank, the cleaning of the deposits in the API standard 650 tanks and the overhaul of its accessories. Regularly inspect and maintain the accessories of the oil tank: valves, oil measuring holes, breathing valves, flame arresters, ladders, foam fire extinguishing generators, etc., and make records. If any damage is found, repair them in time.

The increased uplift described in API Standard 620 tank Appendix Q is intended to apply to the size of the ringwall and foundation but not the anchorage. For tanks with an internal design pressure of 1 lbf/in.2 gauge and over, the uplift, if any, shall be calculated under the combined conditions of 1.25 times the internal design condition plus the design wind load on the API standard 650 tanks shell and roof.

After more than 20 years of ups and downs in the steel industry, BBN company's customers have covered South America, North America, Europe, Africa, Southeast Asia and the Middle East and other countries and regions. We treat every customer who inquires with us sincerely, whether you cooperate with us or not, we will provide you with the best quality steel solutions. Our company team also support the online customer service.

Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!