API standard 650 open-top tanks lining
All API standard 650 open-top tanks fillet welds shall consist of a minimum of two passes. The ends of the fillet welds shall be 2 in. from the rat hole, and these welds shall be deposited by starting 2 in. from the rat hole and welding away from the rat hole. An acceptable alternative to stopping fillet welds 2 in. short of the rat hole would be to weld continuously through the rat hole from one side of the stiffener to the opposite side. All craters in fillet welds shall be repaired by back welding.
The effect of air pressure on the API standard 650 open-top tanks tank walls of the API 650 tank must be considered when the design pressure is greater than 2 kPa.The fixed point method can be used to design the tank wall of atmospheric or micro internal pressure API standard 650 open-top tanks storage tank.
In 2014, we offered 175 ton Cold rolled stainless steel plate to Thailand. The API standard 650 open-top tanks products are from TISCO. Here is the MTC that we offered to customer. We have our own quality team. Our quality team will inspect every order before shipment for customer. Normally, we will test the chemical composition, thickness, width, and length. Here are some pictures for last inspection.
}The main types of metal storage tanks are vertical dome roof tank, vertical external floating roof tank, vertical inner floating roof tank, spherical oil tank and horizontal oil storage tank. API standard 650 open-top tanks is vertical tank. The capacity of vertical dome roof oil storage tank is generally less than 10000 cubic meters. The wall plate adopts sleeve type fillet weld, and it is usually installed by inverted or forward installation method during construction.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.