API standard 650 flat-bottom oil storage tanks roof drain valves
The floating roof is the top cover floating on the liquid level, so the sealing performance of API standard 650 flat-bottom oil storage tanks API 650 oil storage tank is very important. The floating plate mainly adopts elastic packing, and at the same time, it is compressed with the wall of API 650 oil storage tank with pressure strip around, and fixed with the floating plate with bolts. After the API standard 650 flat-bottom oil storage tanks floating plate is lowered to a certain position of about 1.8m, a prop will support the floating plate to keep it in position.
Personnel organization before the construction of the API standard 650 flat-bottom oil storage tanks:The company shall select technical personnel, quality inspectors and material personnel with organizational ability and construction management experience to participate in the API standard 650 flat-bottom oil storage tanks project construction. The construction personnel shall arrive at the construction site before the designated commencement date, investigate the construction site, build construction facilities, plan the construction steps, and analyze the potential safety hazards during operation.
Manufacturer’s Report and CertificateUpon completion of all tests and inspections on each tank API standard 650 flat-bottom oil storage tanks, the Manufacturer shall prepare a report summarizing all the data on the tank, including foundations (if they are within the Manufacturer’s scope of responsibility) and shall attach to the report all drawings and charts as required by other paragraphs in this section of the rules (see API 620 tank 7.13 and Appendix M).The tank Manufacturer shall furnish and fill out a certificate for each tank (such as that shown in Appendix M), attesting that the tank has been constructed according to the rules in this standard. This certificate shall be signed by the Manufacturer and the Purchaser’s inspector. This certificate, together with the nameplate or markings placed on the tank, shall guarantee that the Manufacturer has complied with all applicable requirements of these rules.
Considering the large workload of allocation and transportion for our steel materials, we have built special shipping department, and make it independent form transportation department. The transportation department is in charge of transporting steel materials from our mill and warehouse to the port, and our shipping department is in charge of the shipping matters. So that our whole shipping efficiency is improved, and shorten time for customers to receive goods.
The trend of international shipping development of large-scale ships and strategic joint ventures puts forward higher requirements for modern ports. Modern ports no longer use the general cargo throughput as a measure sign, and container throughput will become the main sign to measure the role and status of modern ports. The average container capacity in 2000 is 3200teu, and it is expected to be 5500teu in 2020.