API standard 650 duplex stainless steel tanks designers

API 650 external floating roof storage tanks are generally called external floating roof API standard 650 duplex stainless steel tanks tanks, which means that the storage tanks are externally open tanks without a dome design, and are equipped with vertical floating roofs. API 650 external floating roof storage tanks are usually used for large More than 20,000 cubic meters of open steel API standard 650 duplex stainless steel tanks storage tanks for storing volatile petroleum products such as crude oil, gasoline, kerosene, etc.

API standard 650 duplex stainless steel tanks foam generator is a fire extinguishing device fixed on the oil tank. One end of the foam generator is connected to the foam pipeline, and one end is flanged on the top layer of the API standard 650 duplex stainless steel tanks wall. Fire extinguishing foam flows through the air intake entrance of the fire foam chamber, inhaling a large amount of air to form foam, and breaking through the insulating glass into the tank (glass thickness is not greater than 2mm), so as to achieve the purpose of fire fighting.

The thickness of the API standard 650 duplex stainless steel tanks annular bottom plates shall be in accordance with Table Q-4 (for steel or aluminum, as applicable). The thicknesses shown are minimums. The ring of annual plates shall have a circular outside circumference, but it may have a regular polygonal shape inside the tank shell with the number of sides equal to the number of annular plates. These pieces shall be butt-welded in accordance with Q.7.1.1, Item b. The plates of the first shell course shall be attached to the annular bottom plates by a weld as required by API 620 oil tank 5.9.5 except when a full-penetration weld is used or required (see Q.7.1.1). Butt-welds in annular plates shall be not closer than 12 in. from any vertical weld.

The quality inspection department is responsible for the inspection management of raw materials and finished products, and the quality inspection and acceptance of products and raw materials. Strictly abide by the company's management system, conscientiously exercise the management power given by the company, and put an end to all ultra vires; be responsible for the inspection of all kinds of raw materials entering the company, and put forward quality problems and handling opinions.

Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!