API standard 650 anchored liquid-storage tanks internal components
The company's sales department has a professional team, they have professional steel knowledge, respond quickly, with the problems raised by customers can quickly give solutions, put the interests of customers first. With their own professional knowledge to provide customers with high-quality steel plate in line with the requirements. At the same time, in terms of price, we also have great advantages. Members of the business department make sure that the delivery time is short and the service is the best.
The preparatory work before the construction of the API standard 650 anchored liquid-storage tanks is an important part of the oil tank project. Material purchase preparation before the construction of the API standard 650 anchored liquid-storage tanks:Before API standard 650 anchored liquid-storage tanks construction, all materials shall be purchased and prepared, and the specifications and quality of materials shall be inspected to see if they meet the construction operation requirements. Fire and rain proof measures should be taken when storing materials. Paint should be stored in a ventilated and dry place.
Impact Tests for High AlloysImpact tests are not required for oil steel storage material nickel alloy welds made with electrodes/filler metals covered by AWS Specification A5.11 or AWS Specification A5.14, provided the nominal nickel content is 50% or greater, and the weld is deposited by the shielded metal-arc welding (SMAW), gas metal-arc welding (GMAW), gas tungsten-arc welding (GTAW), or plasma-arc welding (PAW) processes. When A5.11/A5.14 specifies the nickel content as a “remainder,” the nickel content shall be determined by summing the maximum specified values of the other elements (use the average specified value for elements with specified ranges) and subtracting from 100%.