API 650 welded steel storage tanks shell nozzles and flanges
Requirements for prefabrication of the top of large vertical API 650 welded steel storage tanks: The prefabrication of the tank top shall be prefabricated in blocks according to the drawings. Pay attention to the spacing of the welds after installation when setting out the material. Reinforcing ribs should be formed and inspected with an arc-shaped template. When a single top plate needs to be spliced, butt joints should be used. The forming of a single top plate should be welded between the reinforcing ribs and the top plate on the mould. After forming, check with an arc-shaped sample plate, and the gap should not be greater than 10 mm.The thickness of the API 650 welded steel storage tanks wall plate, t, required by 5.10.3 for the latitudinal unit forces, T2, acting at this level is 0.57 in. The nozzle neck is seamless steel pipe and conforms to ASTM A53, Grade A; the materials in the tank wall and reinforcing pad conform to ASTM A442 Grade 55. The main joints in the tank walls are fully radiographed, double-welded butt joints. The adequacy of the reinforcement and attachment welds shown in Figure F-7 shall be determined.To determine the length of the nozzle neck within the limits of reinforcement, the smaller of the following calculated values shall be used:(2.5)(0.625) = 1.56 in. (2.5)(0.375) + 0.75 = 1.69 in.API 650 external floating roof storage tanks are generally called external floating roof API 650 welded steel storage tanks tanks, which means that the storage tanks are externally open tanks without a dome design, and are equipped with vertical floating roofs. API 650 external floating roof storage tanks are usually used for large More than 20,000 cubic meters of open steel API 650 welded steel storage tanks storage tanks for storing volatile petroleum products such as crude oil, gasoline, kerosene, etc.The company always insists on quality first. "Tolerance and trust, change and innovation, abide by rules, and focus on refining people" are the eternal credo of the team. Encouraged by the same creed and belief, BEBON people continue to grow and mature, and the team size is increasing expand. In the future, look beyond Chinese private steel companies to see BEBON. Looking to the future, we are not blindly pursuing bigger scale, but we are pursuing strength and brand strength.We have our own factory, including the production and manufacturing of steel pipes, with a special API 650 welded steel storage tanks steel pipe manufacturer and storage warehouse. Welcome to visit our factory, we will provide customers with high quality products that meet the requirements. And has the perfect API 650 welded steel storage tanks after-sale service guarantee system, lets the customer save the worry and the labor.
Latest NewsMore+