API 650 SUG II tanks welder

All edges of the inner wall of the API 650 petroleum storage tank to be lined or coated must be rounded and flat to a minimum radius of 3mm. The API 650 SUG II tanks internal welding seam must be completely sealed welding, with a smooth surface and no air holes, air pockets and local protrusions. Remove welding spatter. As specified in API 650 petroleum storage tank design drawings, the seller must perform additional surface treatment.

When the API 650 SUG II tanks is welded, the weldment should be fixed rigidly. After welding, when the weldment is cooled to normal temperature, the rigid fixation can be removed, which can effectively prevent angular deformation and wave deformation. Although some measures have been taken, the welding deformation of API 650 SUG II tanks is still unavoidable, so it is necessary to take corrective measures to compensate the deformation. Mechanical correction is to make the parts easy to deform in the welding process by mechanical or other rigid materials to produce simple deformation, so as to restore the state before welding.

Bearing on Foundations
Foundations shall preferably be designed to resist the load exerted by the API Standard 620 tank and its contents when the tank is filled with water to the design liquid level. Foundations shall be designed at least for the maximum operating conditions including the wind load. During the API 650 SUG II tanks water test, the total load on the foundation shall not exceed 125% of the allowable loading. If necessary, the water level during the test may be reduced below the design liquid level line so as not to exceed the 25% maximum overload (see Q.8.1.2).

The shipping department of the company arranges shipping booking for customers' goods in advance, and makes good matching with inland transportation. Effectively manage and follow up the customer's shipping schedule and give feedback to customers in time. At the same time, the shipping department has a keen insight into the shipping market in different periods to reduce the transportation cost for the company and customers.

The company's logistics and transportation department is responsible for developing high-quality third-party logistics companies, to coordinate and follow up the situation of steel materials transportation. Third-party logistics companies provide us with professional logistics services. With this logistics management method, the time for delivery of steel materials is faster, and the logistics service is professional, multifunctional and comprehensive.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!