API 650 SUG II tanks threaded connections
The advantages of API 650 floating roof tanks have obvious environmental and economic benefits: in a specific climate environment, according to historical data, the economic value of the API 650 SUG II tanks floating roof tanks in API 650 due to the reduction of oil and gas volatilization within 3-6 months is equivalent The installation and purchase cost of the API 650 SUG II tanks inner floating roof means that the cost of the inner floating roof can be recovered within half a year.
All welded seams in the API 650 SUG II tanks bottom, and complete penetration and complete fusion sidewall-to-bottom welds, shall be inspected by means of a vacuum box test as described in Q.8.2.1. Sidewall-to-bottom welds not having complete penetration and complete fusion shall be inspected by means of either a vacuum box test of the inside weld as described in API 620 specification Q.8.2.1, or where approved by the Purchaser, a direct pressure solution film test as described in Q.8.2.2.
Treatment of API 650 SUG II tanks welding defects:1. Lack of fusion: once found, it should be shoveled and grinded off before re welding.2. Incomplete penetration: over standard defects shall be removed and re welded. When welding on both sides, the shallow side of the groove can be grinded and shoveled to expose the welding root on one side, and then the welding is repaired.3. Slag inclusion: over standard defects shall be removed and re welded.4. Crater: weld to full after grinding.5. Air hole: if the internal air hole exceeds the standard, it shall be welded again after being removed by grinding shovel, and the surface air hole shall be removed by grinding wheel and then repaired.
Our company has a comfortable office environment, covers a large area, can accommodate hundreds of people working at the same time. All kinds of green plants are placed in the company, with a healthy office environment. Our company also has gym, table tennis, leisure bar, kitchen, refrigerator, microwave oven and other equipment. Humanized construction provides comfortable office environment for employees.
The company has our own truck fleet, and can transfer products flexibly and quickly. At the same time, we have large warehouses near the ports of Tianjin and Shanghai, so as to ensure that we can deliver high-quality products to customers in the first time. At the same time, it also greatly reduces the transportation cost, and realizes the double harvest of time benefit and economic benefit. Time guarantee is one of the important strengths of our service.
The company formulates clear service process and service standard. To do a good job in after-sales service, first of all, clear service process and service standards should be formulated to let employees know which procedures to perform and which service standards to abide by.