API 650 SUG II tanks external loads
Investigation of SubgradeOn actual steel storage tank sites to be used, test borings or test pits, or both, may be made at the direction of a competent engineer who will specify the number and location. They need not be equally spaced but should be laid out to uncover possible weak spots.In general, test loadings of subgrade at the bottom of test pits need be resorted to only when such heavy loading as may be imposed by footings for major column supports for spheres or similarly elevated API 620 low-pressure tanks is specified. Results may be deceptive if average load-bearing capacity over a considerable area is wanted. All field data shall be recorded with maps, and copies shall be supplied to all engineers concerned with design, erection, and later operation.
API 650 Application As described by the American Petroleum Institute, the fabrication and installation of our surface welded API 650 SUG II tanks steel storage tanks is normally used in industrial applications. In general, our standards for industrial on-site installation of storage tanks are established according to API 650, API 620 and API 12D.
Good news: In May 17th, 2018, the Myanmar navy's local representative visit our office and hot rolled plate production line, and sign another contract 2025 tons LR A shipbuilding steel plates API 650 SUG II tanks order in our office. With the fast development in Myanmar, Myanmar navy build frigate every year. Bebon cooperated with Myanmar Navy company from from 2015. They purchased 412 ton LR AH36 ship steel plate from Bebon as trial order in 2015. After receiving the goods, they speak highly of the quality and bebon's service. After that they purchase the shipbuilding steel plate from bebon regularly.
}When welding API 650 SUG II tanks, in order to avoid weld deformation, it is necessary to use corresponding welding process according to the type of steel used in the tank, such as welding requirements of steel plate, welding position, etc. Reasonable arrangement of the assembly sequence, the use of subsection back welding and jump welding method, strict control of welding process parameters, rigid fixation measures, take corrective measures for deformation compensation are necessary.
Both parties shall confirm the API 650 SUG II tanks material object and the quality of the products, confirm the reasons for the defects and the quality of the products, and sign the quality inspection agreement. Major quality objections shall be reported to relevant leaders in a timely manner, and shall be discussed and solved with the API 650 SUG II tanks steel plant.