API 650 storage tanks side entry mixers

The internal floating plate of internal floating roof tank of API 650 tank is different from that of open floating plate of API 650 storage tanks External floating roof tank of API 650 tank, so it is impossible to have rain and snow load.

Requirements for prefabrication of the top of large vertical API 650 storage tanks: The prefabrication of the tank top shall be prefabricated in blocks according to the drawings Pay attention to the spacing of the welds after installation when setting out the material Reinforcing ribs should be formed and inspected with an arc-shaped template When a single top plate needs to be spliced, butt joints should be used The forming of a single top plate should be welded between the reinforcing ribs and the top plate on the mould After forming, check with an arc-shaped sample plate, and the gap should not be greater than 10 mm

Changes in Tank ShapeIf in any of the foregoing tests there is an excessive rise of the bottom of the tank around the boundary of contact with grade, or off its foundations, or if any of the specified conditions of test loading cause other appreciable changes in the shape of the tank, the design shall be reviewed and means shall be provided in the tank for holding the shape within permissible limits under all conditions of loading,API 650 storage tanks. Additional TestsThe tests prescribed in API 620 tank 7.18 are believed to be sufficient for most tanks constructed according to these rules; if, in the opinion of the designer, additional tests are needed to investigate the safety of a tank under certain other conditions of loading, as determined from the design computations, these tests shall be made on the tank involved in addition to the tests specified in this standard.

Our company will set up a full-time service engineer for the project, who is responsible for the interface and coordination of technical support and after-sales service of the API 650 storage tanks project. In response process of customer service center, in case of technical support and after-sales service demand, the user shall contact the full-time engineer of API 650 storage tanks customer service center, and the technical personnel will give corresponding answers and on-site treatment according to the needs of users.

Management information and high efficiency. Because of the rapid flow of API 650 storage tanks goods, container multimodal transport and "door-to-door" transport, it is required that the port must have a modern information network, so that it can have the comprehensive capabilities of all-weather access, rapid loading and unloading, customs clearance, collection, distribution, storage and transportation

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!