API 650 storage tank flanges

API 650 storage tank test procedure
The inner tank shall be opened to the atmosphere, and a sufficient amount of water shall be added to the inner tank to balance the upward pressure against the inner tank bottom produced by the pneumatic test of the outer tank; as an alternative, the pressure between the inner and outer tanks can be equalized. API Standard 620 Air pressure shall be applied to the space enclosed by the outer tank equal to at least the design gas pressure but not exceeding a pressure that would overstress either the inner or outer tank.

In line with the service concept of "honesty first, customer first" and the service tenet of "all for customer satisfaction", the company adopts the acceptance and response mode of combining manual and automatic, and accepts the diversified service demands of customer business consultation, complaint declaration, business acceptance, etc. through telephone, fax, e-mail, visit, letter, etc.

In view of the characteristics of container transportation, such as high added value, low cargo damage and short time, our company takes more consideration of port collection and distribution conditions, port facilities, flight density and route coverage when choosing ports. For the convenience of customers, as well as the safety of goods.

Deformation of the welding seam of the API 650 storage tank is a common quality problem during the actual use of the API 650 storage tank, which easily causes the tank body to leak and affects the safety of the oil storage tank. The welding seam deformation of the API 650 storage tank is mainly caused by the lack of reserved welding seam gap and irregular operation. The oil storage tank has not reserved the corresponding weld gap, resulting in deeper root removal during the front welding activity. The heat output of the weld will increase under the influence of a long time, and the deformation of the weld will gradually become serious.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!