API 650 self-anchored storage tanks roof plates
API 650 storage tank, double-layer oil tank environmental protection advantages: ordinary single-layer steel API 650 self-anchored storage tanks oil tank is corroded by underground water and gas and electrolytic corrosion because it is buried underground all year round. The API 650 tank has a double-layer structure with a gap of 0.1 mm. The API 650 self-anchored storage tanks outer layer of FRP ensures that the leakage will not directly leak into the soil and water source.
In this project, an elemental area of API 620 oil storage tank wall is constructed of ASTM A516 Grade 55 steel plate subjected to a meridional unit force, T1, of 2620 lbf/in. tension and a latitudinal unit force, T2, of 2880 lbf/in. compression. The meridional radius of curvature, R1, is 132 in., and the length of the normal from the surface to the axis of revolution, R2, is 409 in. The joints in the wall are spot-radiographed, double-welded butt joints, and no corrosion allowance is required.The problem in this example is to graphically find the minimum thickness of tank wall required for the given conditions (see API 620 tank standard 5.10.3.3).Solution: As determined from Table 5-1, the maximum, allowable tensile stress value, Sts, for ASTM A516 Grade 55 steel plate in simple tension is 16,500 lbf/in.2. Since the compressive stress is latitudinal, the governing value of R for this situation is R1, or 132 in.
In order to ensure the safety of the vertical storage tank, API 650 self-anchored storage tanks, the supplier should inspect the tank carefully before delivery. The failure of the tank body is mainly due to the weld and crack of the product. The inspection of API 650 self-anchored storage tanks, vertical storage tank weld and microcrack is mainly to inspect the appearance forming quality of weld. The inspection contents include weld leg height, undercut, welding deformation, weld bead, arc pit, weld straightness, etc., as well as the internal quality of weld, such as slag inclusion, porosity, incomplete penetration, crack, incomplete fusion, etc.
Since its inception, the company has always adhered to the development policy of "survival with quality, development with products, cooperation with credibility, and service with customers". I would like to express my heartfelt thanks to the old and new friends and customers who have always given care, support and help to the company! And sincerely hope to establish a long-term cooperative relationship with them, mutual benefit and common development.
The company's headquarters has a well-established logistics distribution system, which can quickly transport the steel materials to the port through the contracted logistics companies. Professional contracted logistics companies can significantly reduce costs and various commodity-related expenses. Meanwhile, the flexible transfer ensures that the API 650 self-anchored storage tanks steel materials can be shipped immediately after passing the quality inspection.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.