API 650 insulated tanks liquid-mounted seals

Large Low-Pressure Tanks Corrosion Allowance
In cases in which the rate of corrosion is closely predictable, additional metal thickness over and above that required for the initial operating conditions shall be provided and shall be at least equal to the expected corrosion loss during the desired life of the tank.
When corrosion effects are indeterminate before the tank is designed (although they are known to be inherent to some degree in the service for which the tank is to be used), and when corrosion is incidental, localized, or variable in rate and extent, the best judgement of the API 650 insulated tanks designer must be exercised in establishing reasonable maximum excess tank wall thicknesses. For all tanks that come under this classification, a minimum corrosion allowance of 1/16 in. shall be provided.The floating roof is the top cover floating on the liquid level, so the sealing performance of API 650 insulated tanks API 650 oil storage tank is very important. The floating plate mainly adopts elastic packing, and at the same time, it is compressed with the wall of API 650 oil storage tank with pressure strip around, and fixed with the floating plate with bolts. After the API 650 insulated tanks floating plate is lowered to a certain position of about 1.8m, a prop will support the floating plate to keep it in position.Good news: In May 17th, 2018, the Myanmar navy's local representative visit our office and hot rolled plate production line, and sign another contract 2025 tons LR A shipbuilding steel plates API 650 insulated tanks order in our office. With the fast development in Myanmar, Myanmar navy build frigate every year. Bebon cooperated with Myanmar Navy company from from 2015. They purchased 412 ton LR AH36 ship steel plate from Bebon as trial order in 2015. After receiving the goods, they speak highly of the quality and bebon's service. After that they purchase the shipbuilding steel plate from bebon regularly.Personnel organization before the construction of the API 650 insulated tanks:
The company shall select technical personnel, quality inspectors and material personnel with organizational ability and construction management experience to participate in the API 650 insulated tanks project construction. The construction personnel shall arrive at the construction site before the designated commencement date, investigate the construction site, build construction facilities, plan the construction steps, and analyze the potential safety hazards during operation.After-sales service is an important part of measuring a product good or not. After sales service can't be ignored. Good service can really make consumers feel relieved. We have always done a good job in after-sales service, so as to bring consumers a better reference when purchasing and a better experience during use of our steel materials. We will call back and follow up the performance of our steel products regularly.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!