API 650 ground supported tanks full-fillet weld
Design calculations and drawings required API 650 ground supported tanks for the fabrication and erection of each API 650 tank. A drawing index for each API 650 tank is required and shall be re-submitted each time drawings are revised and re-issued.
Our company's business departments are a group of excellent and hard-working employees, who constantly carry out knowledge updating and steel knowledge training every day, only to provide better and professional services to customers.
Shell Stiffening Rings for Tanks That Contain LiquidInternal or external shell stiffening rings may be required to maintain roundness when the tank is subjected to wind, vacuum, or other specified loads. When API 650 ground supported tanks stiffening rings are required, the stiffener-to-shell weld details shall be in accordance with Figure Q-1 and Q.3.5.2 through Q.3.5.5.Three-plate laps or butt-weld junctions in tank bottoms shall be not closer than 12 in. from each other or from the butt-welds of the annular plates.Bottom plates, other than annular bottom plates for a 9% or 5% nickel steel or stainless steel tank that contains liquid, may have a minimum thickness of 3/16 in. exclusive of any specified corrosion allowance.
The company has passed the ISO9001: 2008 quality system certification, strictly implemented the ISO9001 quality management system. Besides, we have continuously improved the after-sales service network to make every effort to provide more convenient, accurate and faster services for all customers. We will supervise the production, control the quality in the factory, Inspect the cargo before shipment, Issue the test report to sales department. From the steel prodcution to steel delivery, we always focus the whole process.