API 650 ground-supported liquid storage tanks vacuum breaker vent
API 650 petroleum storage tank body design is mainly the design of tank bottom, API 650 ground-supported liquid storage tanks tank top and tank wall, and the design of tank wall is particularly important. As the main pressure bearing part of API 650 petroleum storage tank, the tank wall bears loads including liquid pressure, wind pressure, seismic load, opening stress, etc. The calculation of such loads is explained in detail in various API 650 ground-supported liquid storage tanks storage tank design standards. But in addition, the API 650 petroleum storage tank wall also bears the push-pull force and torque of the connected pipeline.
The increased uplift described in API Standard 620 tank Appendix Q is intended to apply to the size of the ringwall and foundation but not the anchorage. For tanks with an internal design pressure of 1 lbf/in.2 gauge and over, the uplift, if any, shall be calculated under the combined conditions of 1.25 times the internal design condition plus the design wind load on the API 650 ground-supported liquid storage tanks shell and roof.
API 650 ground-supported liquid storage tanks Oil measuring hole: The oil measuring hole is used to measure the height, temperature and sampling of the oil stored in the tank, and is installed near the tank top platform. API 650 ground-supported liquid storage tanks Fire extinguisher: The fire extinguisher (also known as the flame arrestor) of the oil tank is composed of a fire box, a copper wire mesh and an aluminum partition. It is installed under the breathing valve or safety valve to prevent sparks and air from entering the inside of the tank through the breathing valve or safety valve and causing accidents.
Training is one of the important factors in the construction of corporate culture. Online training system can be used to enable all employees to take advantage of fragmented time and carry out targeted training anytime and anywhere without the limitation of time and region. Through training to improve work skills, at the same time, through training, let all improve their quality education level, let employees work around a goal, create a career, and produce results.
Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).
Both parties shall confirm the API 650 ground-supported liquid storage tanks material object and the quality of the products, confirm the reasons for the defects and the quality of the products, and sign the quality inspection agreement. Major quality objections shall be reported to relevant leaders in a timely manner, and shall be discussed and solved with the API 650 ground-supported liquid storage tanks steel plant.