API 650 carbon steel tank formulas
Upon completion of API 650 carbon steel tank construction, provide Purchase with a Vendor's Certification that the tank conforms to the requirements of API 650 and to the additional requirements as specified.
The manufacturing requirements of bottom plate of vertical metal tank, API 650 carbon steel tank are as follows: 1. In order to compensate welding shrinkage, the layout diameter of tank bottom is 5-2mm than the design diameter; 2. The butt joint of edge plate of tank bottom shall be machined automatically or semi-automatically; 3. The distance between any two adjacent welding joints on the tank bottom plate and the distance between the butt joint of edge plate and the longitudinal weld of bottom ring wall plate shall not be greater than 200 mm.
The API 650 carbon steel tank stiffener ring and backing strip (if used) are primary components, and they shall comply with the requirements of API 620 storage steel tank Q.2.1. The stiffener rings may be fabricated from plate using an intermittent weld on alternating sides between the web and the flange.Except for aluminum or stainless steel tanks, all fillet welds shall consist of a minimum of two passes. The ends of the fillet welds shall be 2 in. from the rat hole (see Figure Q-1), and these welds shall be deposited by starting 2 in. from the rat hole and welding away from the rat hole. An acceptable alternative to the detail that includes stopping fillet welds 2 in. short of the rat hole would be to weld continuously through the rat hole from one side of the stiffener to the opposite side. All craters in fillet welds shall be repaired by back welding.
Every customer who has visit us and witness the steel materials before delievry will be impressed by our quality control departemnt. Even not come to inspect the steel materials before delievry, our quality control departemnt will also send inspection report to the customer. For each order, no matter its quantity and value, our quality control departemnt will make strict inspection before delivery, the inspection contents include apperance, tolerance, dimension, mark, special requirements of customers, etc. To guarantee our steel materials sent to the customer is qualified.
Booking space and making power of attorney (ten copies of order); the data of the original order shall be correct and consistent to the greatest extent when making the order, so as to reduce the frequent changes in the subsequent process. For booking with the company's seal for booking space, if the accessories for booking space (such as the price confirmation document of the shipping company) need to be provided, they can only be booked with all of them. Obtain the shipping space allocation receipt and extract the ship name, voyage number and B / L number information.