API 650 anchored tanks ram valve
In this project, an area of steel storage oil tank wall is constructed of ASTM A285, Grade C, steel plate that is 5/8-in. thick and has spot-radiographed, double-welded butt joints. The wall is subject to tension in a meridional direction and to compression in a latitudinal direction. The values of R1 and R2 at the point under consideration are 75 in. and 300 in. respectively. A corrosion allowance of 1/16 in. is required. The computed (meridional) tensile stress, stc, in the net thickness after deduction of the corrosion allowance is 6000 lbf/in.2.
Before pressure test, the main drain hose system of API 650 petroleum storage tank floating roof should be thoroughly flushed. Provide blind flanges, gaskets and bolts required for the API 650 anchored tanks test (other types of covers are also required if necessary). Covers for maintenance shall be provided in accordance with the interfaces specified by API 650 petroleum storage tanks, and these seals shall remain in place after the test; and for those interfaces that are not provided for maintenance covers, the covers can be removed after the API 650 anchored tanks test.
In November of 2015, Thailand one company contacted with us from Internet. They are find the trustable supplier of S355J2H seamless pipe API 650 anchored tanks for there cable car supporter. Due to the special using of the pipes, they are very careful and servious when choosing the supplier. After one months contact and discussion by email, they come to our company. We drive to the pipe mill for visit of 2 days. Through this visit, they are very confident with our production ability and proucts quality. Finally, they accept the grade we suggest Q345D. After back to office, they put the order of 1400 tons pipe to us directly.
}High temperature heat transfer oil fin tube heating device for large API 650 anchored tanks has the advantage of reducing the leakage of heating coils. The heating medium of the large storage tank heating device is high-temperature heat-conducting oil. The boiling point of the heat-conducting oil is high, usually higher than 200°C. At high temperatures, the pressure on the heat-conducting oil circulation pipeline is very small, which greatly reduces the occurrence of heating coil leakage accidents. At the same time, the temperature difference between the inside and outside of the tube is guaranteed.
The after-sales service personnel understand the user's ideas and needs in detail, and stand on the other side's position and interests. Actively communicate with users and help them solve practical problems. This not only solves the service problem, but also improves the customer's trust in the company.