API 650 anchored liquid-storage tanks stored liquid
Stamping of API 620 storage tank PlatesBefore plates required to be stamped by the steel mill are used, the inspector shall see that they bear the stamp. In laying out and cutting the API 650 anchored liquid-storage tanks plates, at least one set of the original material identification markings should, if possible, be left where it will be plainly visible when the tank is completed. Should the identifying marks be obliterateSpot radiographic or ultrasonic examination shall be not less than 6 in. extending along the weld. Spot radiography shall comply with the standards given in 7.15.1.3. Where spot radiographic or ultrasonic examination is applied at joint intersections, the surface shall be prepared and examined for a distance of 3 in. on each side of the intersection, making the minimum length of examination 6 in. on the horizontal weld and 3 in. on the vertical weld.
The API 650 is the American standard for welded flat-bottomed vertical API 650 anchored liquid-storage tanks storage tanks. This standard dictates tank design, manufacture, welding, inspection and installation requirements.
BBN had provided API 650 anchored liquid-storage tanks Hardox plates for more than 15 years for widely applied in coal mining machinery, cement equipment, road construction machinery, engineering machinery, dump trucks, metallurgical area and port fields. In 2016,we brought our customer to visit our API 650 anchored liquid-storage tanks NM400 steel plate producing line and our Shanghai warehouse for 30000 tons plate and structure. As a result, Our client purchased 500 tons NM 400 as first order, which is shipped by 3 times. In future, BBN will always guarantee that all the delivery condition for Hardox plate provided will be with quenching and tempering, which is the best delivery type according GBT 24186 standard.
}Crack treatment of API 650 anchored liquid-storage tanks weld area: find out the crack tip with ray or ultrasonic flaw detection, drill cut-off holes at both ends of the crack with the cut-off method, the hole depth is slightly greater than the crack depth, or groove (crack stop groove) is made by angle grinder at both ends of the crack, shovel and grind the whole crack, and grind it into a suitable groove; use radiographic inspection and dye detection to verify that the crack has been completely excavated, and finally repair welding.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.