API 650 aluminum tanks welder
After more than 20 years of ups and downs in the steel industry, BBN company's customers have covered South America, North America, Europe, Africa, Southeast Asia and the Middle East and other countries and regions. We treat every customer who inquires with us sincerely, whether you cooperate with us or not, we will provide you with the best quality steel solutions. Our company team also support the online customer service.
Welding inspection of bottom plate of API 650 aluminum tanks, vertical oil tank: During the fabrication and installation of API 650 aluminum tanks, the bottom edge plate is welded first. According to the requirements of the technical standard, penetrant inspection is required for the weld of edge plate at the bottom of API 650 aluminum tanks, that is, penetrant testing is required for each weld bead priming, filling and capping. In the process of testing, if any defect is found, it shall be repaired immediately. After the repair, the surface coloring penetrant test shall be conducted again until the test result is qualified.
The thickness of the API 650 aluminum tanks wall plate, t, required by 5.10.3 for the latitudinal unit forces, T2, acting at this level is 0.57 in. The nozzle neck is seamless steel pipe and conforms to ASTM A53, Grade A; the materials in the tank wall and reinforcing pad conform to ASTM A442 Grade 55. The main joints in the tank walls are fully radiographed, double-welded butt joints. The adequacy of the reinforcement and attachment welds shown in Figure F-7 shall be determined.To determine the length of the nozzle neck within the limits of reinforcement, the smaller of the following calculated values shall be used:(2.5)(0.625) = 1.56 in. (2.5)(0.375) + 0.75 = 1.69 in.