API 650 aboveground steel oil storage tanks design pressure

Our company attaches great importance to technical support and after-sales service, and has established a customer service center to provide unified technical support and service for API 650 aboveground steel oil storage tanks various engineering projects. Customer service center has a strong technical force of technical service team, composed of a customer service center manager, several API 650 aboveground steel oil storage tanks after-sales service personnel, responsible for unified acceptance and processing of local after-sales service needs.

The preparatory work before the construction of the API 650 aboveground steel oil storage tanks is an important part of the oil tank project. Material purchase preparation before the construction of the API 650 aboveground steel oil storage tanks:
Before API 650 aboveground steel oil storage tanks construction, all materials shall be purchased and prepared, and the specifications and quality of materials shall be inspected to see if they meet the construction operation requirements. Fire and rain proof measures should be taken when storing materials. Paint should be stored in a ventilated and dry place.

The impact tests for API 620 welded storage tanks used pipe (including structural members made of pipe), bolting, and forgings, shall be in accordance with ASTM specifications ASTM A333 (seamless only) pipe, ASTM A36 Mod 1 plate, ASTM A131 Grades CS, D, and E steel plate, ASTM A633 Grade A CSA G40.21 Grades 38WT, 44WT and 50WT high-strength low-alloy structural steel plate, ASTM A350 carbon and low alloy steel forgings, and ASTM A320 Grade L7 bolts.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!