aluminum sheet 5086 API Std 650 unanchored flat-bottom tank
The API Std 650 unanchored flat-bottom tank stiffener ring and backing strip (if used) are primary components, and they shall comply with the requirements of API 620 storage steel tank Q.2.1. The stiffener rings may be fabricated from plate using an intermittent weld on alternating sides between the web and the flange.Except for aluminum or stainless steel tanks, all fillet welds shall consist of a minimum of two passes. The ends of the fillet welds shall be 2 in. from the rat hole (see Figure Q-1), and these welds shall be deposited by starting 2 in. from the rat hole and welding away from the rat hole. An acceptable alternative to the detail that includes stopping fillet welds 2 in. short of the rat hole would be to weld continuously through the rat hole from one side of the stiffener to the opposite side. All craters in fillet welds shall be repaired by back welding.
API 650 storage tank, double-layer oil tank environmental protection advantages: ordinary single-layer steel API Std 650 unanchored flat-bottom tank oil tank is corroded by underground water and gas and electrolytic corrosion because it is buried underground all year round. The API 650 tank has a double-layer structure with a gap of 0.1 mm. The API Std 650 unanchored flat-bottom tank outer layer of FRP ensures that the leakage will not directly leak into the soil and water source.
On March 17 th 2018, our Sudan customer purchased the SG295 cylinder steel coils through other country such as UAE,Turkey before they cooperate with us. After they research our regular customer in Uganda, UAE, and his friends in China, he is satisfied with our company. Our produced SG295 cylinder steel is mainly used to fabricate low temperature pressure vessels like gas cylinder. The customer is very satisfied to our API Std 650 unanchored flat-bottom tank quality control and professional arrangement for the SG295 steel order.
}The preparatory work before the construction of the API Std 650 unanchored flat-bottom tank is an important part of the oil tank project. Material purchase preparation before the construction of the API Std 650 unanchored flat-bottom tank:Before API Std 650 unanchored flat-bottom tank construction, all materials shall be purchased and prepared, and the specifications and quality of materials shall be inspected to see if they meet the construction operation requirements. Fire and rain proof measures should be taken when storing materials. Paint should be stored in a ventilated and dry place.
After the order is finished, our after-sales service center will send an email to make a feedback about our steel products' quality. We have phone service every three months to remind our customers of the possible problems and collect advices or suggestions in quality and service. Upon the collection of advices or suggestions, our after-sales service will quickly make technical solutions to wipe out the customer problem.