A573 Gr 70 plates API Std 650 welded steel oil storage tanks
Impact Test Requirements for Oil storage tanks Primary ComponentsAll API Std 650 welded steel oil storage tanks primary components of 9% or 5% nickel steel shall be impact tested in accordance with Q.2.2.2 through Q.2.2.4. Impact testing is not required for primary components of austenitic stainless steel, nickel alloy, and aluminum materials. Welds in high-alloy (austenitic) stainless steel shall be impact tested if required by Q.6.3.Impact testing of plates, including structural members made of plate, shall comply with the following:a)Impact test specimens shall be taken transverse to the direction of final plate rolling. b)Charpy V-notch specimens shall be cooled to a temperature of –320°F for A353, A553, and A645 steels for impact testing.
API 650 Tanks in which liquid fluids are stored and designed to withstand atmospheric pressure operation, less than 18 kPa, or internal pressures not exceeding the weight of the API Std 650 welded steel oil storage tanks roof, with temperatures no higher than 93, 3 C are included in the scope of this design code.
our company supplied 2300 ton API 5L GrB ERW pipe to Petroleum company in 2016. It takes 35 days for our company to finish all the production according to API 5L standard. The products are used to drilling , gas transmission works. And we supply the API5L PSL1 GR B original Mill Test Certificate, API5L PSL1 GR B pipes picture, the dimension test, the API Std 650 welded steel oil storage tanks material, heat number, supplier name and size will be shown on the surface of steel pipe.
}High temperature heat transfer oil fin tube heating device for large API Std 650 welded steel oil storage tanks has the advantage of reducing the leakage of heating coils. The heating medium of the large storage tank heating device is high-temperature heat-conducting oil. The boiling point of the heat-conducting oil is high, usually higher than 200°C. At high temperatures, the pressure on the heat-conducting oil circulation pipeline is very small, which greatly reduces the occurrence of heating coil leakage accidents. At the same time, the temperature difference between the inside and outside of the tube is guaranteed.
The company has passed the ISO9001: 2008 quality system certification, strictly implemented the ISO9001 quality management system. Besides, we have continuously improved the after-sales service network to make every effort to provide more convenient, accurate and faster services for all customers. We will supervise the production, control the quality in the factory, Inspect the cargo before shipment, Issue the test report to sales department. From the steel prodcution to steel delivery, we always focus the whole process.