A516 Gr 415 plates API standard 650 open-top tanks
All edges of the inner wall of the API 650 petroleum storage tank to be lined or coated must be rounded and flat to a minimum radius of 3mm. The API standard 650 open-top tanks internal welding seam must be completely sealed welding, with a smooth surface and no air holes, air pockets and local protrusions. Remove welding spatter. As specified in API 650 petroleum storage tank design drawings, the seller must perform additional surface treatment.
The thickness of the API standard 650 open-top tanks wall plate, t, required by 5.10.3 for the latitudinal unit forces, T2, acting at this level is 0.57 in. The nozzle neck is seamless steel pipe and conforms to ASTM A53, Grade A; the materials in the tank wall and reinforcing pad conform to ASTM A442 Grade 55. The main joints in the tank walls are fully radiographed, double-welded butt joints. The adequacy of the reinforcement and attachment welds shown in Figure F-7 shall be determined.To determine the length of the nozzle neck within the limits of reinforcement, the smaller of the following calculated values shall be used:(2.5)(0.625) = 1.56 in. (2.5)(0.375) + 0.75 = 1.69 in.
The API standard 650 open-top tanks must go through strict inspection before putting into use. Inspection of plate groove of API standard 650 open-top tanks, vertical oil tank: After finishing the groove processing of oil tank plate, it is necessary to conduct dye penetrant inspection on the groove. This process is mainly aimed at the hard damage of groove in the machining process and the defects of the plate itself. If any defect is found, it shall be processed again until the defect disappears.
we develop very well through those years even the external environment is not conducive to the whole steel industry. With the prosperity of our group, our company always bear its staff who contributes to its growth in mind, and always on the way to improve welfare and treatment. That makes us staff and work with pleasure. On the other way, they creat a better and stronger our group. That may be one of the key factors why we develop so rapidly those years. Here we can say proudly “we are family”.
The company's logistics and transportation department is responsible for developing high-quality third-party logistics companies, to coordinate and follow up the situation of steel materials transportation. Third-party logistics companies provide us with professional logistics services. With this logistics management method, the time for delivery of steel materials is faster, and the logistics service is professional, multifunctional and comprehensive.
Adhere to the spirit of quality first and user foremost, carry out maintenance and other work according to the requirements of the buyer's contract, and ensure that the engineering project and product after-sales play their application effectiveness. Our company guarantees to carry out self inspection and self supervision according to the quality management policy proposed by our company, and deliver a high-grade, perfect and excellent system engineering to users.