A420 grade WPL6 pipe API 650 anchored tanks
The company has a group of mature steel plate production and processing line construction and production management experience. In addition, the company has professional and technical personnel. BBN steel is a modern enterprise integrating scientific research and development, production processing, sales and service. The company now has finance department, production department, sales team, technical department, quality control department, logistics department and after-sales service team. At the same time, it also adheres to international standards and adheres to the international line.In addition to the requirements of API Standard 620 tank Appendix Q.8.1, the nameplate shall be attached to the tank at an accessible location if it is outside of any insulation or protective covering of the tank. The nameplate for the inner tank shall be located on the outer tank wall but shall refer to the inner tank. The nameplate, if any, for the outer tank of a double-wall tank shall be located adjacent to the nameplate or the inner tank and shall refer to the outer tank.Oil, Gas, Chemical, Water, and Bio-Fuel storage. Maximum of the most common welded steel tanks used in industry are designed following API 650. Tanks typically found in Refinery API 650 anchored tanks tank farms, Terminals, Pipelines, and other process facilities use these tanks.The company attaches great importance to the value of iron and steel, constantly improving itself in terms of attitude, innovation, human resources, etc., integrating the value of iron and steel into the company's philosophy, showing the spirit of fighting for API 650 anchored tanks iron and steel, forging iron and steel enterprise, creating steel market, establishing iron and steel team, and attaching importance to the sustainable development of iron and steel industry, so as to make iron and steel our permanent cause,API 650 anchored tanks. weld tightness test: remove dirt from the API 650 anchored tanks weld, apply white powder emulsion, spray kerosene on the other side of the weld after drying. Because of the strong penetration of kerosene, if kerosene is sprayed after 12 hours (under low temperature conditions, the time can be extended), if the surface of the welded seam coated with white emulsion has no spots, the welded seam meets the requirements.
Latest NewsMore+