9m diameter API Std 650 closed top welded storage tanks
In line with the service concept of "honesty first, customer first" and the service tenet of "all for customer satisfaction", the company adopts the acceptance and response mode of combining manual and automatic, and accepts the diversified service demands of customer business consultation, complaint declaration, business acceptance, etc. through telephone, fax, e-mail, visit, letter, etc.
The preparatory work before the construction of the API Std 650 closed top welded storage tanks is directly related to the quality assurance, project progress, construction safety and other aspects of the entire oil tank project. Therefore, the preparation work before the API Std 650 closed top welded storage tanks construction should be paid attention to and planned. Before API Std 650 closed top welded storage tanks construction, you need to prepare conventional machinery, materials, and facilities, as well as the quality control of the project, such as the installation method of the API Std 650 closed top welded storage tanks, the welding method of the steel plate, and the inspection of the tank material. In addition, there is the most important item, construction safety protection.
The API 620 large storage tank nozzle neck is fabricated by welding from 1/2-in. plate. The materials in the tank wall, the nozzle neck, and the reinforcing pad conform to ASTM A442 Grade 55. The main joints in the tank wall are fully radiographed, double-welded butt joints. The longitudinal joint in the nozzle neck is of the same type API Std 650 closed top welded storage tanks but is not radiographed; however, the longitudinal joint and all other parts of the nozzle-and-wall-plate assembly have been shop stress relieved after fabrication, as required by 5.25. The adequacy of the reinforcement and attachment welds shown in Figure F-6 shall be determined.