90ft diameter API Std 650 carbon and low-alloy steel tanks

The internal floating plate of internal floating roof tank of API 650 tank is different from that of open floating plate of API Std 650 carbon and low-alloy steel tanks External floating roof tank of API 650 tank, so it is impossible to have rain and snow load.

Prefabrication requirements of API Std 650 carbon and low-alloy steel tanks, large vertical storage tank wall panels:
1. The prefabrication of wall panel shall be processed in strict accordance with the requirements of the drawings, and inspection records shall be made.
2. After the wall panel is rolled, it should be placed on the platform for inspection with a template. In the vertical direction, use a straight-line template to check, the gap should not be greater than 2 mm, and in the horizontal direction, use an arc-shaped template to check, and the interval should not be greater than 4 mm.
3. When wall panels are rounded, attention should be paid to prevent irreversible plastic deformation caused by external forces. After rolling, it should be placed on the platform for inspection, and then placed on the prepared mold.

API 620 storage tanks relative standard for referenceAPI Spec 5L, Specification for Line PipeAPI RP 520, Sizing, Selection, and Installation of Pressure-relieving Devices in Refineries, Part II—InstallationASME B31.3, Chemical Plant and Petroleum Refinery Piping (ANSI/ASME B31.3) ASME B36.10M, Welded and Seamless Wrought Steel Pipe (ANSI/ASME B36.10) ASME B96.1, Welded Aluminum-Alloy Storage Tanks (ANSI/ASME B96.1)ASTM A36 Structural Steel for API Std 650 carbon and low-alloy steel tanksASTM A53 Zinc-Coated Welded and Seamless Pipe

The company regularly holds sales elites to share experiences, to promote the rapid growth of colleagues, and achieve the company and employees. The company conducts employee skill training and related knowledge video learning from time to time. All these things is to improve the employees' skills and literacy, and reflects its own value. It has always been the pursuit of BBN steel to enhance the employee’s ability and keep up with the times.

The company uses outsourced logistics operations. Our cooperated professional third-party logistics providers use the advantages of large-scale production and cost advantages to achieve cost savings by increasing the utilization of resources in each link, so that we can benefit from the separation of cost structure. Therefore, we can also provide customers with better, faster and more efficient cargo transportation, delivery, and lower freight costs.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!