5652 aluminum tube API 650 welded aluminum storage tanks

In line with the service concept of "honesty first, customer first" and the service tenet of "all for customer satisfaction", the company adopts the acceptance and response mode of combining manual and automatic, and accepts the diversified service demands of customer business consultation, complaint declaration, business acceptance, etc. through telephone, fax, e-mail, visit, letter, etc.The {keyword shell that contains the liquid shall have butt-welded annular bottom plates with a radial width that provides at least 24 in. between the inside of the shell and any lap-welded joint in the remainder of the bottom and at least a 2-in. projection outside the shell. The stated values apply to full-sized specimens. For sub-size specimen acceptance criteria, see ASTM A20. An impact test temperature lower than the design metal temperature may be used by the API 620 large welded, low pressure storage tanks Manufacturer.Corrosion allowance, if specified, shall be added to calculated API 650 tanks shell and self-supporting roof thicknesses; to minimum nominal thicknesses of bottom and supported API 650 welded aluminum storage tanks roof plates; to nozzles and manholes; and to all exposed surfaces of internal structural members and non-removable internals.Safety production is the cornerstone of enterprise survival and development. The company established a safety management network, which achieved clear powers and responsibilities, clear responsibilities, effective management and control, and provided organizational guarantee for safe production. The company strictly complies with the "Environmental Protection Law", establishes an effective environmental protection emission control system and waste gas, waste water, waste solid recycling system, and makes great efforts to harden, lighten, green, and beautify the plant, and strive to build green steel enterprises.Treatment of API 650 welded aluminum storage tanks welding defects:
1. Lack of fusion: once found, it should be shoveled and grinded off before re welding.
2. Incomplete penetration: over standard defects shall be removed and re welded. When welding on both sides, the shallow side of the groove can be grinded and shoveled to expose the welding root on one side, and then the welding is repaired.
3. Slag inclusion: over standard defects shall be removed and re welded.
4. Crater: weld to full after grinding.
5. Air hole: if the internal air hole exceeds the standard, it shall be welded again after being removed by grinding shovel, and the surface air hole shall be removed by grinding wheel and then repaired.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!