5652 aluminum tube API 650 stainless steel storage tanks
We have Business Department, Transportation Department, Document Department, Shipping Department, E-C department, Procurement Department, Finance Department, Human Resources Department, Administration Department, Logistics Department, After-sales so on Departments. Each department performs its own duties, unites and cooperates, and contributes its greatest strength to the overall operation of the company. So as to ensure the stable and sustainable development of the company.
Before welding the API 650 stainless steel storage tanks, the professional skills of the welding personnel shall be fully assessed to ensure that the operators meet the corresponding welding qualifications. According to the technical standards, scientific and feasible process requirements are actually formulated. In the process of welding the edge plate of API 650 stainless steel storage tanks, electric welding is required on one side of the edge plate, so that the edge plate has a free shrinkage effect and greatly reduces the residual stress of the welding seam.
API 620 Tank DesignThe designer of these large tanks API 650 stainless steel storage tanks shall supply the data on superimposed loadings to be assumed for the foundation design or, if there are no foundations, for direct loading on the subgrade. A slab or mat may be provided to support the superstructure and shall be considered to distribute the load more evenly over a lower natural subgrade compared with merely stripping, leveling, and rolling the existing grade.For simple spheroids or tanks of similar design, in which the distribution of the imposed weights shifts because the liquid level in combination with the vapor pressure may change the shape of the tank, the designer shall consider the possibility of such a change.