5456 aluminum plate API 650 SUG II tanks
The shipping department of the company arranges shipping booking for customers' goods in advance, and makes good matching with inland transportation. Effectively manage and follow up the customer's shipping schedule and give feedback to customers in time. At the same time, the shipping department has a keen insight into the shipping market in different periods to reduce the transportation cost for the company and customers.
Strictly control the welding groove forming of API 650 SUG II tanks: in order to ensure the geometric dimension of assembly and good welding of welding seam, before hoisting and laying, the edge of all metal vertical storage tank plate shall be polished by grinder, and the flatness of plate shall be ensured according to the design requirements. Strictly control the size of API 650 SUG II tanks weld assembly: measures must be taken to strictly control the assembly size of metal vertical tank bottom plate during assembly.
API 620 storage tanks relative standard for referenceASTM A106 Seamless Carbon Steel Pipe for High-Temperature ServiceASTM A131 Shipbuilding Structural Steel for API 650 SUG II tanksASTM A134 Welded Steel PipeASTM A182 Forged or Rolled Alloy-Steel Pipe Flanges, Forged Fittings, and Valves and Parts for High-Temperature ServiceASTM A193 Alloy-Steel and Stainless Bolting MaterialsASTM A194 Carbon and Alloy Steel Nuts for Bolts for High-Pressure and High-Temperature ServiceASTM A213 Seamless Ferritic and Austenitic Alloy-Steel Boiler, Superheater, and Heat Exchanger TubesASTM A240 Stainless Steel Plate, Sheet, and Strip for Pressure VesselsASTM A283 Low and Intermediate Tensile Strength Carbon Steel Plates