5052 aluminum pipe API Std 650 tanks

The API Std 650 tanks stiffener ring and backing strip (if used) are primary components, and they shall comply with the requirements of API 620 storage steel tank Q.2.1. The stiffener rings may be fabricated from plate using an intermittent weld on alternating sides between the web and the flange.
Except for aluminum or stainless steel tanks, all fillet welds shall consist of a minimum of two passes. The ends of the fillet welds shall be 2 in. from the rat hole (see Figure Q-1), and these welds shall be deposited by starting 2 in. from the rat hole and welding away from the rat hole. An acceptable alternative to the detail that includes stopping fillet welds 2 in. short of the rat hole would be to weld continuously through the rat hole from one side of the stiffener to the opposite side. All craters in fillet welds shall be repaired by back welding.

Similarities between API 650 and API 620 tanks Both tanks are used for storage purposes. Both API 620 and API 650 containers API Std 650 tanks can be made of carbon steel, austenitic stainless steel and nickel alloy (only for low temperature).

On September 14th 2019, a Australia customer purchased 500 tonsDIN17155 15Mo3 boiler steel plates, which will be used for vessel modification of wax backflow protection project and LPU project. Many old customers keep asking about Din17155 steel grade-15Mo3. Usually our company would suggest customers to choose EN10028 steel specification, but if customer insiste on the old steel grade, we could arrange it either. With years of experience in produceing DIN 17155 15Mo3 boiler steel plates, the company supplies high quality steel API Std 650 tanks product with low cost and better service.

}

The preparatory work before the construction of the API Std 650 tanks is directly related to the quality assurance, project progress, construction safety and other aspects of the entire oil tank project. Therefore, the preparation work before the API Std 650 tanks construction should be paid attention to and planned. Before API Std 650 tanks construction, you need to prepare conventional machinery, materials, and facilities, as well as the quality control of the project, such as the installation method of the API Std 650 tanks, the welding method of the steel plate, and the inspection of the tank material. In addition, there is the most important item, construction safety protection.

The company is deeply supported and loved by customers with its unique business philosophy and business model. The company has always been adhering to the "credibility first, integrity-based, quality first" purpose, and sincerely serve new and old customers. Over the past twenty years, the company has won the trust of customers by relying on good service and good reputation. Our aftersales team’s main responsibility is to deal with quality feedback and complaints from Customer.

Have a question? Get a Free Consultation

If you are interested in our storage tanks, you can get contact with us through online consulting, demand table submission, e-mails and telephones.

Corporate Office

High-Tech Development Zone, Zhengzhou, China

Contact us

+86-371-86151527
[email protected]

Send a Message!