30ft diameter API standard 650 aboveground steel oil storage tanks
Hydrostatic TestThe API standard 650 aboveground steel oil storage tanks product shall be vented to the atmosphere when it is filled with or emptied of water. During water filling, the elevations of at least four equidistant points at the bottom of the tank shell and on top of the ringwall or slab shall be checked. Differential settlement, or uniform settlement of substantial magnitude, requires an immediate stop to water filling. Any further filling with water will depend on an evaluation of the measured settlement.API 650 is an American standard for welding flat bottom vertical storage tanks. This API standard 650 aboveground steel oil storage tanks standard specifies requirements for the design, manufacturing, welding, inspection and installation of storage tanks. API 650 is widely used in storage tanks designed to withstand low internal pressures and used to store typical products such as API standard 650 aboveground steel oil storage tanks crude oil, gasoline, chemicals and water. BBN has extensive experience in API 650 tanks, from +/- 500 cubic meters of tanks produced in the factory to +/- 15000 cubic meters of tanks produced on site.We supply 5800 tons A53 Gr B ERW pipes to Qatar for Qatar Integrated Railway Project - Green Line. This is the first Metro Line in Qatar, and it is located in Doha. We got the order by tender, launched by the Qatar Railways Company for designing, construction and completion of Green Line Project. Before putting order, a delegation from the API standard 650 aboveground steel oil storage tanks project side visited us and several other famous steel pipe mills in China for 15 days. Finally, we were chosen and finished the task exceeding their expectations.Prefabrication requirements of API standard 650 aboveground steel oil storage tanks, large vertical storage tank wall panels:1. The prefabrication of wall panel shall be processed in strict accordance with the requirements of the drawings, and inspection records shall be made.2. After the wall panel is rolled, it should be placed on the platform for inspection with a template. In the vertical direction, use a straight-line template to check, the gap should not be greater than 2 mm, and in the horizontal direction, use an arc-shaped template to check, and the interval should not be greater than 4 mm.3. When wall panels are rounded, attention should be paid to prevent irreversible plastic deformation caused by external forces. After rolling, it should be placed on the platform for inspection, and then placed on the prepared mold.The company has passed the ISO9001: 2008 quality system certification, strictly implemented the ISO9001 quality management system. Besides, we have continuously improved the after-sales service network to make every effort to provide more convenient, accurate and faster services for all customers. We will supervise the production, control the quality in the factory, Inspect the cargo before shipment, Issue the test report to sales department. From the steel prodcution to steel delivery, we always focus the whole process.
Latest NewsMore+