12m diameter API Std 650 storage tank
The outer layer of API 650 tank is glass fiber reinforced plastic layer with a thickness of more than 2.5mm, which API Std 650 storage tank has strong corrosion resistance and electric corrosion resistance. Special process technology is used between the two layers to make the gap reach 0.1 mm, so as to eliminate the existence of potential safety hazard from the root.
API Std 650 storage tank Oil measuring hole: The oil measuring hole is used to measure the height, temperature and sampling of the oil stored in the tank, and is installed near the tank top platform. API Std 650 storage tank Fire extinguisher: The fire extinguisher (also known as the flame arrestor) of the oil tank is composed of a fire box, a copper wire mesh and an aluminum partition. It is installed under the breathing valve or safety valve to prevent sparks and air from entering the inside of the tank through the breathing valve or safety valve and causing accidents.
The Charpy V-notch test shall be used, and the minimum impact value at the design metal temperature shall be as given in Table R-2. For subsize specimen acceptance criteria, see ASTM A20. An impact test temperature lower than the design metal temperature may be used by the API 620 welded storage tanks Manufacturer, but in such a case the impact values at the test temperature must comply with Table R-2.
The company focuses on teamwork and builds a team with a dream. For society: we focus on quality first, integrity-based, service-oriented create value for customers and wealth for the society. For employees, the company promote healthy living, happy work, unity, innovation. For working, we seek the efficient operation, the pursuit of excellence. Welcome to come, visit our office building and join us.
Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).